GT2 2 mm Timing Belt Profile Dimensions

Timing Belts · Gates PowerGrip GT2 / GT3

GT2 2 mm timing belts (Gates PowerGrip GT2 / GT3) have a 2 mm (0.079 in) pitch, a tooth height of 0.71 mm (0.028 in) and an overall belt height of about 1.52 mm (0.060 in). Common widths: 3, 6, 9 mm. A pulley with z teeth has a pitch diameter of z × 2 mm / π.

pPitch
2 mm0.079 in0.079 in2 mm
hₜTooth height
0.71 mm0.028 in0.028 in0.71 mm
hₛBelt height (typical)
1.52 mm0.060 in0.060 in1.52 mm

Drawing

pitch linep = 2 mmp = 0.079 in1.52 mm0.060 in0.71 mm0.028 in
Two pitches, teeth down. Pitch and heights to scale; the curved tooth outline is simplified.Proportions shown, not to scale · Dimensions in mmDimensions in inches

GT2 2 mm specifications

pPitch2 mm0.079 in
hₜTooth height0.71 mm0.028 in
hₛBelt height (typical)1.52 mm0.060 in
uPitch line differential (PLD)0.254 mm0.010 in
Tooth profileModified curvilinear
Common widths3, 6, 9 mm

The standard belt on 3D printers and small CNC machines: 6 mm wide, with 20-tooth pulleys (PD 12.73 mm, 40 mm of belt per revolution) or 16-tooth pulleys (PD 10.19 mm, 32 mm per revolution). Heights listed are Gates 2MGT values; generic GT2 belts are often 1.38 mm overall with 0.75 mm teeth. Gates has replaced GT2 with GT3 in its industrial range; GT3 belts run on GT2 pulleys.

Also known as

GT22GT2MGT

Other profiles with the same pitch (not interchangeable)

All timing belt profiles

Compare all 22 profiles in the Timing Belts chart →

Sources

  1. ISO 5296:2012, Synchronous belt drives. Belts with pitch codes MXL, XXL, XL, L, H, XH and XXH
  2. ISO 13050:2014, Curvilinear toothed synchronous belt drive systems (HTD-type profiles)
  3. Gates: Industrial Power Transmission Preventive Maintenance manual (belt profile table)
  4. Optibelt: ALPHA POWER polyurethane timing belts, product range (T and AT profiles)
  5. Optibelt: Technical manual, rubber timing belt drives (STD, HTD, trapezoidal)
  6. Pfeifer Industries: Timing belt tooth profiles and pitches

Values last checked against these sources on November 15, 2026. · How we check data

Reference values for planning and identification. Confirm critical dimensions with the manufacturer's drawing or the current edition of the standard before production.